
Mechanical design of new air conditioning for an existing building, comprising the removal of the existing water-sourced heat pump with tower, pumps and boiler, replaced with an air-cooled, variable refrigerant flow (VRF) control system including chiller, boiler, pumps, FCUs and BMS. In collaboration with Venita.


